The scope of work included temporary lighting and power for a three story building with a basement. (2) Power benches per floor and temporary all throughout the hallways, stairs and rooms. This scope also included the installation of a new 400amp temporary service from Pepco where we had to perform the excavation, installation of the concrete duct banks and conduit for Pepco’s wiring, Pepco’s disconnect and new panel to feed the building.